The Daily Dig

Highpoint Health, Sumner Station is converting its existing emergency department and outpatient campus in Gallatin into a satellite acute care hospital. The State of Tennessee Health Facilities Commission approved the project on June 24, 2026. The project carries a $59.3 million price tag covering construction, medical equipment, and engineering. Work includes renovating 41,845 square feet of existing space and adding 2,705 square feet of new construction on the Big Station Camp Boulevard campus.

The centerpiece of the expansion is an 8-bed inpatient pediatric unit. It will be the only dedicated pediatric inpatient unit in the service area. The unit is built for moderate-to-low acuity overnight pediatric care, giving families across a six-county region an alternative to driving into Nashville for hospitalization. That pediatric service area spans Sumner, Macon, Robertson, Trousdale, Smith, and Wilson counties.

Beyond pediatrics, the project adds inpatient and procedural capacity the campus doesn't currently have. New infrastructure includes 12 adult inpatient beds, a 4-bed intensive care unit, two operating rooms, and a dedicated endoscopy suite. A diagnostic and therapeutic cardiac catheterization lab is also part of the build, bringing cardiovascular intervention directly to the campus.

The expansion adds full ancillary support to match the new inpatient services, including an on-site pharmacy, a clinical laboratory, and dietary and cafeteria operations. Existing outpatient services on campus will stay fully operational throughout construction. That includes the 24/7 emergency department, the Carpenter Cancer Center, Imaging for Women, and Highpoint Health Partners clinics for Family Wellness, Neurology, and Therapy Services. Independent specialist suites, housing providers in fields such as pediatrics, dermatology, and community medicine, fall under that same continuity.

Snapshot:

Location: 225 Big Station Camp Boulevard, Gallatin, TN 37066

Regulatory Approval: Tennessee Health Facilities Commission, approved June 24, 2026

Total Project Investment: $59,335,000 (construction, equipment, and engineering)

Renovation Scope: 41,845 square feet

New Construction: 2,705 square feet

Project Type: Conversion of existing ER/outpatient campus into a satellite acute care hospital

Pediatric Unit: 8 beds, only dedicated pediatric inpatient unit in the service area

Adult Inpatient Beds: 12

ICU Beds: 4

Operating Rooms: 2

Additional New Services: Cardiac catheterization lab, endoscopy suite, on-site pharmacy, clinical laboratory

Pediatric Service Area: Sumner, Macon, Robertson, Trousdale, Smith, and Wilson counties

Adult Primary Service Radius: 10 miles, covering Gallatin (37066), Hendersonville (37075), Cottontown (37048), Portland (37148), and White House (37188)

Existing Services Remaining Operational: 24/7 ER, Carpenter Cancer Center, Imaging for Women, Highpoint Health Partners (Family Wellness, Neurology, Therapy Services), independent specialist suites

TheJobWalk Thoughts

A live ER stays open through this entire build, which puts infection control risk assessments and interim life safety planning near the top of any GC's early-stage priorities. Crews working near active patient care should expect real restrictions on noise, dust, and access windows once work begins.

The cath lab and two ORs are the scope that typically draws specialty trades first on projects like this. Medical gas systems are a standard requirement for inpatient rooms and operating suites, and equipment vendors who engage early tend to have an advantage once procurement ramps up.

An 8-bed pediatric unit is a small footprint with real regional weight. Drawing from six counties on a facility this size means steady patient volume from day one, which matters for anyone bidding future campus phases or long-term facility service contracts on this site.

Source: Highpoint Health

Reply

Avatar

or to participate

Keep Reading